A cheap air conditioning installation is often a real company doing a smaller job than the one you think you bought. The number falls because the pump, the new breaker, the extra pipe, the making good or the warranty registration was never in the sentence. The cost guide shows what a full domestic job tends to contain. The quote-lines guide lists the small print. This page is the pattern: which pieces vanish first, and how to ask for them back before you accept.

The four lines that go missing
Electrics. The indoor unit is fed from somewhere. A spare way and a short cable are cheap. A board that is full, a long run, or a board that should have been upgraded years ago is not. If the quote says 'electrics by client' and you are the client, you have not priced the job.
Condensate. Gravity to outside is the quiet result. A pump is a fair extra when the unit sits on an internal wall. A quote that ignores drainage will rediscover it as a stain. Ask which one they designed.
Pipe and access. The included metres might be five, and the real route might be twelve, plus a ladder or a scaffold the photo hid. Making good might mean a mastic smear rather than a plaster patch you can paint. None of these are crimes if they are written down. They are how a cheap total stays cheap.
Paper you also did not buy
Warranty registration is a five-minute job that some prices skip. The manufacturer then treats the unit as unofficial, and the callback becomes your argument. Ask who registers it and for how many years.
F-gas certification is not an optional extra you can delete to save money. The company that works on the refrigerant needs it. A price that only makes sense if a friend 'finishes the gas' is a price to walk away from. GOV.UK publishes the certification duty.
Planning and freeholder consent are sometimes 'by client' for good reason. They still need a slot in the programme. A cheap install booked for Tuesday that cannot be drilled because the landlord answers on Friday is not cheap. It is parked.
How to test a low number without insulting anyone
Send the same photos and the same room list to a second firm. Ask both to tick electrics, drain, pipe length, making good, registration and VAT. The compare-quotes guide is this test in a calmer order. You are allowed to prefer the lower tick-complete price. You are looking at trouble if you prefer the lower price with the ticks missing.
The national cost guide is the sense-check. A figure far under that band can be a short pipe, a ready board and a ground-floor wall. It can also be a missing half. Ask which. Good contractors will tell you, because they would rather lose the job than own the callback.
A cheap brand is a separate topic, with its own brands guide. A mid brand on a cut-down scope can cost more to live with than a workhorse brand on a full scope. Buy the scope first. Then choose the badge inside it.
Keep the saving you actually wanted
The saving worth having is one outdoor unit serving two rooms instead of two outdoor units, a gravity drain instead of a pump you do not need, and a survey that avoids a scaffold. Those are design savings. They belong in the quotation as choices.
The saving that comes back as a bill is the one that deleted the electrician. Put the electrician back before you pay a deposit. The estimate guide explains how first numbers and final accounts diverge. This page is the list of usual suspects.
If the room is a gym, a shop or a server cupboard, a domestic 'cheap install' pattern is even less use. Use the commercial or server-room cost guides. The missing lines there include access, out-of-hours work and alarms, which dwarf a filter.
Frequently asked questions
Is the cheapest quote always incomplete?
No. A short, easy job should be cheaper. Read the scope. If electrics, drain, pipe and registration are included and the building really is simple, the low price can be the right one.
Can I save money by buying the unit online?
Sometimes, if the installer will commission that unit and the warranty is clear. Often the labour quote rises, or the warranty does not. Compare the whole job, using the supply-and-fit guide.
What is the one line to check first?
Who connects the electrical supply, and whether a new breaker is included. It is the line most often left as 'by others'.
Where are fair prices described?
The UK and London installation cost guide sets out bands and what pushes a job around. Use it as context, then compare surveyed quotes for your postcode.
Core buying guides
Start with these high-intent guides, then dig into the rest of the library.
Related guides
More costs guides
Sources and further reading
How this guide was prepared
This guide was written by the Local AC Installers Editorial Team. We compare official guidance, legislation and established consumer information, separate general information from project-specific advice, and show publication dates and sources. We do not accept installer accreditation claims at face value.